FS#8173 — FS#12044 — Upgrade Peering EQUINIX SAN JOSE

Attached to Project— Network
Maintenance
Whole Network
CLOSED
100%
We're increasing the peering capacity at EQUINIX SAN JOSE to 4x10G instead of
the current 2x10G this evening at 6pm CET (9am PST)

There should not be any interruption in IPv4 and IPv6 sessions during the intervention.
Date:  Monday, 17 November 2014, 19:54PM
Reason for closing:  Done
Additional comments about closing:  Perering EQUINIX SAN JOSE was upgraded with 40GB and no cuts in session BGP.