Get webhook notifications whenever Network & Infrastructure creates an incident, updates an incident, resolves an incident or changes a component status.
We will perform a series of preventive maintenances of the UPS.
The uninterruptible power supply will be by-passed during the manipulations.
We will start today with UPS 3 at RBX 2.
Update(s):
Date: 2010-11-25 09:34:56 UTC The preventive maintenance will take place on UPS 1 RBX 3 today (room 41).
The UPS will be by-passed during the operations.
Date: 2010-11-17 12:22:55 UTC We will do the maintenance on UPS 5 of RBX 2.
Date: 2010-11-08 19:04:25 UTC The batteries on UPS4 were replaced.
Remains the maintenance to perform on UPS 6 and 7.
Date: 2010-10-22 12:52:11 UTC The manufacturer has received the replacement batteries.
The technicians are currently intervening.
Date: 2010-10-20 19:16:15 UTC UPS 3 was maintained Tuesday.
UPS 4 was updated on Wednesday. During the intervention, we had a
problem on two batteries. The battery branch has been isolated the time
to be able to replace defective batteries.